How to Load Demonstration

Loading the Executive Rotating Frame-in-A-Frame

 

 

 

1. Rotate inside frame to remove two (2) "U" shaped clips from the side of the frame 2. Open frame and rolex gmt lay flat on a flat surface. 3. Position/arrange display object(s) atop one of the frame inserts.

 


 

 

4. Fold unused frame/insert side onto side of frame with display objects on it. 5. Firmly hold the center-side of the frame and slide the two (2) "U" shaped clips in to place. 6. Orient horizontally or longines watches vertically in accordance with your display…..ENJOY!

Loading the Slimline Rotating Frame-in-A-Frame with Base

 

 

 

1. Remove clips, align inner frame omega replica watches with outer frame and open on a flat surface. 2. Position/arrange display object(s) atop one of the frame inserts. 3. Squeeze and hold the frames together.

 

 

 

4. Firmly hold both sides of the frame together and slide the clips into place. 5. Place frame centered in base. 6. Orient horizontally or vertically in accordance with your display….ENJOY!

Loading the Stand Alone Frame with Base

 

 

 

1. Separate frame from base/stand. 2. Remove two (2) "U" shaped clips from the side of the frame. 3. Open frame and lay flat on a flat surface.

 

 

 

4. Fold unused frame/insert side onto side of frame with display objects on it. 5. Firmly hold the center-side of the frame and slide the two (2) "U" shaped clips in to place. 6. Secure frame atop base/stand oriented horizontally or vertically in accordance with your display….ENJOY!