How to Load Demonstration |
||
Loading the Executive Rotating Frame-in-A-Frame |
||
|
|
|
1. Rotate inside frame to remove two (2) "U" shaped clips from the side of the frame | 2. Open frame and rolex gmt lay flat on a flat surface. | 3. Position/arrange display object(s) atop one of the frame inserts. |
|
|
|
4. Fold unused frame/insert side onto side of frame with display objects on it. | 5. Firmly hold the center-side of the frame and slide the two (2) "U" shaped clips in to place. | 6. Orient horizontally or longines watches vertically in accordance with your display…..ENJOY! |
Loading the Slimline Rotating Frame-in-A-Frame with Base |
||
|
|
|
1. Remove clips, align inner frame omega replica watches with outer frame and open on a flat surface. | 2. Position/arrange display object(s) atop one of the frame inserts. | 3. Squeeze and hold the frames together. |
|
|
|
4. Firmly hold both sides of the frame together and slide the clips into place. | 5. Place frame centered in base. | 6. Orient horizontally or vertically in accordance with your display….ENJOY! |
Loading the Stand Alone Frame with Base |
||
|
|
|
1. Separate frame from base/stand. | 2. Remove two (2) "U" shaped clips from the side of the frame. | 3. Open frame and lay flat on a flat surface. |
|
|
|
4. Fold unused frame/insert side onto side of frame with display objects on it. | 5. Firmly hold the center-side of the frame and slide the two (2) "U" shaped clips in to place. | 6. Secure frame atop base/stand oriented horizontally or vertically in accordance with your display….ENJOY! |